Difference between revisions of "Buildout"
From Lowell Makes
Jump to navigationJump to search (Created page with "= Buildout and Expansion = This page serves as the brainstorming hub for plans surrounding the buildout of Lowell Makes into the MVCIA and Below Grade. Each major function of L…") |
|||
Line 39: | Line 39: | ||
=== Scanning Electron Microscope === |
=== Scanning Electron Microscope === |
||
=== Wood Shop === |
=== Wood Shop === |
||
+ | * Add four new 220V outlets |
||
+ | ** 1 on left wall, for old table saw |
||
+ | ** 3 new along right wall (for a total of 4) |
||
+ | *** dust collector |
||
+ | *** Saw stop |
||
+ | **** ground route with kick plate to prevent tripping |
||
+ | *** future tool |
||
+ | *** future tool |
||
+ | ** If cost of new outlets scales poorly, reduce to 3 new runs |
||
+ | * Move wood storage out to new stock storage area |
||
+ | ** Change to small vertical storage area within shop |
||
+ | * HVAC and filtration |
||
+ | * Access Control |
||
+ | ** Add ctrl-o gating to power |
||
+ | * Dust collector enclosure |
||
+ | ** Add power sensing to automatically engage when tools run? |
||
=== Wood Stock Storage === |
=== Wood Stock Storage === |
||
+ | * Horizontal rack storage |
||
=== Electronics Benches === |
=== Electronics Benches === |
||
=== IT Cabinet === |
=== IT Cabinet === |
||
=== Break Area === |
=== Break Area === |
||
+ | Same as currently, coffee and tea, soda machine |
||
=== Leatherworking Shop === |
=== Leatherworking Shop === |
||
=== Metalworking Shop === |
=== Metalworking Shop === |
||
+ | * Bridgeport? |
||
+ | ** Would require 3-phase 220V run |
||
=== Pottery Studio === |
=== Pottery Studio === |
||
=== Lockers === |
=== Lockers === |
||
=== Bike Shop === |
=== Bike Shop === |
||
+ | |||
+ | |||
+ | == Layout == |
Revision as of 20:09, 18 March 2015
Buildout and Expansion
This page serves as the brainstorming hub for plans surrounding the buildout of Lowell Makes into the MVCIA and Below Grade. Each major function of Lowell Makes has a separate section of this page for plans, requirements, wishes, and open questions.
Floors and Functions
Upper Level
- Retail space
- Conference rooms
- Class area
- 3D Printing
- Lounge
- Kitchen
- Scanning Electron Microscope
Lower Level
- Wood Shop
- Wood Stock Storage
- Electronics Benches
- IT Cabinet
- Break Area
- Leatherworking Shop
- Metalworking Shop
- Pottery Studio
- Lockers
- Bike Shop
Functional Breakdown
Retail space
Conference rooms
Class area
3D Printing
Lounge
Kitchen
Scanning Electron Microscope
Wood Shop
- Add four new 220V outlets
- 1 on left wall, for old table saw
- 3 new along right wall (for a total of 4)
- dust collector
- Saw stop
- ground route with kick plate to prevent tripping
- future tool
- future tool
- If cost of new outlets scales poorly, reduce to 3 new runs
- Move wood storage out to new stock storage area
- Change to small vertical storage area within shop
- HVAC and filtration
- Access Control
- Add ctrl-o gating to power
- Dust collector enclosure
- Add power sensing to automatically engage when tools run?
Wood Stock Storage
- Horizontal rack storage
Electronics Benches
IT Cabinet
Break Area
Same as currently, coffee and tea, soda machine
Leatherworking Shop
Metalworking Shop
- Bridgeport?
- Would require 3-phase 220V run